Car Park Surfacing - Case Study
Tesco Stores - Kensington, London
Installation overview
Following a site inspection by the stores chief executive the main contractor was given 1 week to refurbish the car park deck around the main entrance to this flagship store. Due to tight time scales the work had to be carried out during the night without disruption to the operation of the store which was open 24 hours.
Special considerations
With vehicular movements and pedestrians in the vicinity special attention to safety had to be considered. This included the type of preparation and the product selection that had to be low odour and fast curing. With all of this in mind ERS successfully sourced a material that met the
criteria and the work was carried out with minimal disruption and in time for the store to be re-inspected.
Why ERS was selected
With the ability to source materials from many of the countries leading manufactures, and because we are fully approved and certificated in the use of all of their product ranges ERS has the ability to react at short notice with full manufacturers back up.
Related Pages:
Case Studies:
Feature: Car Park Decking

Euro Resin Solutions are expects when it comes to revitalising Car Park Decking.
